Select one of the headings below for information on some of our recent projects
Call centre for Etihad, Voyager Building, Manchester Airport T2
Storage facility for Mawdsley Brooks, Doncaster
Production facility for Boxford Engineering, Elland
Patrington Haven Leisure Park Complex
Chesterfield College
line

Other projects recently completed or yet to commence -

- Large residential project, Wetherby
- Office refurbishments, Manchester, St Helens, Sheffield and Salford Quays.
- New offices, Ripon.
- Medical centres, York and Manchester.

example

line

Call centre for Etihad, Voyager Building, Manchester Airport T2
The project comprised the fit out of levels 4 and 5 of the existing Voyager building. We completed the said fit out with our partnering company, Heatworks ltd in 12 weeks. The level/quality of services was extremely high resulting in a very high specification call centre. The value of works completed in the 12 week timescale was approximately 1.5million.

As a result of this successfully completed project we have now commenced a new project with the main contractor JF Finnegan ltd and are progressing further potential works for Etihad.

example

line

Storage facility for Mawdsley Brooks, Doncaster
We have recently completed the conversion/enhancement of two storage/administration buildings, Quest 22 and 90 located in the Doncaster. Each building had been provided with a basic/minimal level of services, these were enhance/replaced to provide a state of art energy efficient facility for Mawdsley Brooks to operate from.

Within the controlled temperature storage areas intelligent, self contained lighting was provided, this allowed enhanced capital allowances to be claimed whilst energy bills have been kept to the minimum. In addition the existing security and fire alarm systems were upgraded commensurate with the building new operational requirements.

example

line

Production facility for Boxford Engineering, Elland
This is a new production facility built in conjunction with Marshall Construction. Initially base lighting, power and fire alarms were provided to the building which consisted of a two storey office/utility space, storage area, main production facility, access road, car park and service yard. Our scope was then increased to include data cabling to office areas and production, process power and to upgrade the production area lighting to the ECA qualification standard.

Works have continued as the client is constantly upgrading/enhancing his processes with new machinery being connected as and when this is procured.

example

line

Patrington Haven Park, Leisure Complex
This was originally a recreational pool with a small gym and associated changing facilities and has been more than doubled in size to create a substantial sports and leisure facility consisting of large gym/dance studio with associated utilities, Health and Beauty suite, bar, bar lounge and commercial kitchen.

We have worked in conjunction with the client, Havercroft Construction and the architect to create a comfortable, modern attractive environment that will encourage visitors from local and surrounding areas.

example

line

Chesterfield College
The site consisted of an existing central campus block with entrance lobby, small library, main hall, refectory corridor, utilities and two external quadrants. The project entailed the demolition of the existing building elements to create a new distinctive main entrance for the campus, new student services, reception and new library.

The reception was complemented by the creation of a new social space by roofing over the main quadrant. In addition new administration offices, boardroom and a senior management suite of offices were serviced. The electrical services were a combination of new and extension/modification of existing, new consisting of Intelligent energy efficient lighting, small power, voice and data, disabled refuge, electrical to mechanical and lightning protection.

The existing fire alarms, security and power distribution systems were extended and enhanced as necessary to suit the new building layout and college operational requirements.